Project
Rudartsi

Rehabilitation of Road III-1003 "Dragichevo - Rudartsi - Kladnitsa" from km 0+000 to km 9+339,20=9+200, including Emergency Landslide Strengthening in section from km 4+464 to km 4+917on road III-1003

The project restores and improves the operating characteristics and bearing capacity of the pavement and improves drainage. Cold recycling technology was used. The road is two-lane, with a gauge and width of the road surface, ranging from 7.50 m (in urban areas) and from 5.50 to 6.50 m outside the urban areas – the road passes through the villages: Dragichevo, Rudartsi and Kladnitsa. More than half of the road passes through heavy mountain terrain – coils, curves with small radii and large longitudinal slopes. During the construction, a landslide was activated, which is strengthened by piling foundation and anchored reinforced concrete walls. A Control and Measurement System (CIS) has been constructed for geodetic monitoring of  the deformations of the executed anti-landslide structures.

Employer: Road Infrastructure Agency

Construction value – BGN 8 599 313,64 excluding VAT