Project
Road Mezdra - Botevgrad
Update of technical design and construction of the site: Road I-1 (E-79) "Mezdra - Botevgrad", Lot 1 - from km 174+800 to km 194+122"
(Yellow FIDIC)
The project envisages modernization of the existing road I-1 (E79) "Mezdra - Botevgrad", from km 174+800 to km 194+122, and its widening to a four-lane road, with two separate carriageways with two lanes each, with a dividing strip (G20), as well as construction of bypass roads of the villages Lyuti Dol, Novachene and Skravena. The design speed is 80km/h.
Employer: Road Infrastructure Agency
Construction value: BGN 158,187,786.91 excluding VAT