Project
Road Kalotina
Modernization of the road I-8 Kalotina - Sofia Ring Road from km 1+000 to km 15+500 and stage connection, including Construction of a permanent railway line from km 52+898 to km 53 +476.47 (on the railway line) and a facility at km 3+640"
(Under the FIDIC Yellow Book conditions of contract)
Road I-8 in the section from the Kalotina border crossing to the city of Sofia is part of the main trans-European transport network on the territory of the Republic of Bulgaria. The modernized section is part of an important connection that ensures traffic between two large border points - the Kalotina checkpoint on the Serbian border and the Kapitan Andreevo checkpoint on the Turkish border. The following facilities have been constructed: 4 road junctions, several bridge structures, embankments, concrete walls, collector systems, anti-noise barriers, reconstruction of utilities.


The existing situation of the railway has been restored after the completion of the railway overpass over road I-8. The section is part of Main Railway Line No. 1 Kalotina - Sofia - Plovdiv - Svilengrad - borders with Turkey and Greece between Dragoman and Kalotina train stations.
Employer: Road Infrastructure Agency
Construction value: BGN 137,491,883.28 excluding VAT
Co-financed by the Connecting Europe Facility of the European Union - Transport Sector